Next Case Study

Previous Case Study

 

A five bedroom house for Styro Build Yorkshire

                                                         

One of Styro Builds new vans  

 

The Styro Build ground floor is laid

 

Setting out the blocks

 

 

The walls up and the first floor being laid

 

Wall bolts are placed in wet concrete

 

The wallplate is att. to the bolts

The roof trusses are att. to wallplate

 

Trusses att. to S.Build walls

     

 

Gable ends going up

 

 

Job well done.

 

 

 

Roof Going On

 

Doors In

Velux In Place

 

End Wall

     

Prior To Rendering