Styro Build start to build the basement of the new NHS Hospital in Royal Tunbridge Wells.
|
|
|
Fig 1 |
|
Fig 2
Walls going up. |
|
|
|
|
|
|
Fig 3
A Styro Build operative laying out the blocks to plan.
|
|
More blocks being layed and the trestle support sytem being installed.
This keeps the blocks true whilst the construction and pour takes place.
|
|
|
|
|
|
|
The walls being erected |
|
The blocks are carefully cut. |
|
|
|
|
|
|
The walls going up. |
|
The steel reinforcing for the basement walls |
|
|
|
|
|
|
|
|
The trestle supports going up - 1 |
|
|
|
|
|
|
The trestle supports going up - 2 |
|
The hand rails and safety rails are erected. |
|
|
|
|
|
|
The walls being checked prior to pour
|
|
The big concrete pump. |
|
|
|
|
|
|
Styro Build Block and beam flooring being laid. |
|
The basement having the Styro Build Floor being laid. |
|
|
|
|
|
|
|
|
|
|
|
|
The first pour of concrete over the basement (capping). |
|
The floor being levelled. |
|
|
|
|
|
|
Laser levelling in process. |
|
The east wing taking shape. |
|
|
|
|
|
|
The east wing from the rear, starting to take shape. |
|
A view of the concrete being poured from the concrete lorry into the hopper, ready for pumping. |
|
|
|
|
|
|
The west wing ,first floor starts to take shape. |
|
The second storey is built. |
|
|
|
|
|
|
A Styro Build operative hard at work. |
|
Nearing completion. |
|
|
|
Back of Finished Hospital |
|
Front View awaiting landscaping |
|
|
|
Classical Architecture |
|
Cont. |